in Jodhpur India sales price shop near me near me shop factory supplier Metal Tile Forming Machine Company manufacturer best Cost Custom Cheap wholesaler

  in Jodhpur India  sales   price   shop   near me   near me shop   factory   supplier Metal Tile Forming Machine Company manufacturer   best   Cost   Custom   Cheap   wholesaler

We will provide very best services and higher high quality merchandise with all sincerity. If you are fascinated in any of our items or would like to talk about a likely buy, remember to feel free of charge to make contact with us. We examine each and every piece of bearing by ourselves before supply. EPT Tile Forming EPT Business
one period Nice appearence period
two interval Low noise interval
three time period Substantial performance period
four time period Excellent top quality interval
five interval Esay handle period of time
Guy-manufactured uncoiler-Roll forming EPT-compture management technique-EPT handle system-type cutter

XiHu (West Lake) Dis.hu (West Lake) Dis. device
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and place of the metal sheet period of time The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the right situation and handed to the roll forming system period Can modify the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position period of time It aposs mounted framework to make confident can not shift very easily time period
Roll Forming System colon
Roll forming system consist of EPT body comma EPT system comma EPT motor and roll forming technique period
A period of time EPT frame adopts welding construction with shot blasting and portray treatment method
B period All rollers substance adopt high good quality No interval forty five steel comma with tough chrome coated on surface area comma all remedy by total CNC EPTs comma to make certain the rollers with good rigidity and precision comma and form excellent roofing sheet as per design period of time
C period of time All rolling shafts are manufactured by substantial quality No interval 45 metal with quench and mood remedy comma so the shafts with very good rigidity which could use for EPT tern with out deformation time period
D interval Rolling shafting supporting structure kind is metal wall and welded with the basement together to have rigidity interval
E period of time Cycloidal pin EPT velocity EPT motor EPTn comma the back again solEPT roller EPTn by EPT comma portion of upper sollower rollers EPTn by EPT
F period Adjust the screw bar manually to modify the distance among upper sollower rollers for distinction thickness of sheet time period
lparAttention colon All rolling system has altered in our firm as a ideal circumstance comma we don apost suggest to modify the rollers at random comma if needed comma must alter by a knowledgeable technician or soon after teach by our engineer period of time Otherwise will trigger the EPT can not form a great profile

Very last station should be like this there is no area amongst

Reducing system

A time period Adopts post cutting comma the cutting blade materials is Cr12 with quenched treatment comma following chopping comma there is no material wasted time period
B interval Adopts welded frame for great rigidity period of time
C interval The chopping motion is droved by the EPT from EPT station which guarantees the procession of the chopping and minimal noisy comma EPT existence interval

It is controlled by EPT wheel oil pump period Right after filling the EPT oil into the EPT oil tank comma the pumps EPT the cutter EPT to start the cutting task time period
The system incEPTs a established of EPT tank comma a set of EPT oil pump comma two EPT pipes interval And two sets of electromagnetism valves time period
EPT of the oil pump colon 3kw
EPT oil colon forty num
PLC manage technique

It adopts EPT personal computer to manage period of time The focus on piece aposs size is adjustable and digit of it can be modified interval Computed manner has two modes colon EPT and manual one period of time The technique is easy to work and use period of time
Processing precision colon Within one period00mm
It contains touch EPT comma programmer comma transformer for the electronic EPTs and kits of every single element interval
PLC is EPTiwan Panasonic
Transducer model is EPTiwan taida
The seller ought to provide EPT and EPT language EPT
Counter
A single counter gauges length comma pulses comma and decides duration interval

Appropriate to method Metal plate
Rollers 11rows
Proportions eleven ast1 period2 ast0 period9m
EPT 3kw lpar2sets rpar cycloidal needle wheel variety
Diameter of the roller cent52mm
Body of the EPT Welded 300H metal side board is manufactured of 16mm metal composition
Reducing to length utilizing traveling saw chopping
Decoiler colon Expansion kind max commaloading1-2T
Voltage 380V 50Hz

  in Jodhpur India  sales   price   shop   near me   near me shop   factory   supplier Metal Tile Forming Machine Company manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Jodhpur India  sales   price   shop   near me   near me shop   factory   supplier Metal Tile Forming Machine Company manufacturer   best   Cost   Custom   Cheap   wholesaler