Provider & Good quality controlWe offer comprehensive drawings and supply whenever required. Good quality and credit history are the bases that make a corporation alive. Our product assortment includes all sorts of helical gear, spur equipment, bevel equipment, equipment rack, worm gear, sprockets,chains, bearings. CE Certification EPT Kneader, EPT Dispersion Mixer
Usage:
The EPT is relevant for plasticating and miXiHu (West Lake) Dis.ng rubber and plastics,and also relevant for miXiHu (West Lake) Dis.ng or kneading sticky components.
Quick Introduction for EPT KneaEPT(plastics):
MiXiHu (West Lake) Dis.ng Chamber
It is made up of a quotw quot form entire body and two side boards created of substantial quality metal plates by signifies of extrusion forming and welding, which are jacked to get the circulation of cooling h2o or steam. It is plated with hard chrome on its inside walls.
Typical Notice EPT
Timing EPT pump to the sealing method on a typical EPT of EPT oil, lubrication sealing impact.
Thermal Resistance (or thermal few)
There is a plug-in thermal resistance or thermal few in center EPT of the bottom of the chamber to be linked to EPT method to examine and handle the miXiHu (West Lake) Dis.ng temperature.
Rotors
It is created to the hollow blades of banbury variety. The hollows are connected with aXiHu (West Lake) Dis.al gap of rotor shaft used as cooling or heating passage. The top edges and the facet faces of blades are floor welded with difficult alloy and floor, then plated with challenging chrome and poEPTd.
Cooling/heating System
A widespread piping program is adopted for possibly cooling or heating material in miXiHu (West Lake) Dis.ng operation. By way of the method cooling drinking water or steam is fed in 3 waEPTto the cavities of the rotors blades, – the jackets of the miXiHu (West Lake) Dis.ng chamber and the best RAM.
Tilting System
It consists of a rotor with brake, cycloidal EPT EPT, TP type worm and worm EPT, and many others. It is ready to actuate the miXiHu (West Lake) Dis.ng chamber tilting by 140 deg Close to the entrance rotors.
Dust Stop Gadget
At the joint in between the best of miXiHu (West Lake) Dis.ng chamber and the cantiEPTed arm of the EPT body, the dust sealing assembled with curved slotted partings are utilised for obXiHu (West Lake) Dis.Hu (West Lake) Dis. an excellent and trustworthy sealing purpose. The end experience of the rotor is sealed by conclude get in touch with sealing with non oil-lubrication and it seals nicely and is dress in-resistance and resilient.
Principal Driving Program
The portion is made up with major motor, EPT, connecting EPTs. It realizes odd-pace rotation of rotors with managing confront a single other.
Pneumatic management method
Pneumatic control method is managed by PLC purchase. A bi-directional air cylinEPTmakes the RAM up or down. In case of the more than load happens when miXiHu (West Lake) Dis.ng chamber, the prime RAM can be lifted instantly or manually if required, so as to protect motor from overloading.
Electrical Management Program
EPTorted PLC device and electrical control parts which are all EPTed merchandise or EPTed EPT products are adopted in the electrical management technique as to increase control trustworthiness.
Dust Sealing System
MiXiHu (West Lake) Dis.ng chamber catchy interface rack cantiEPT the oil dust seals and timing result oiling dust, EPT framework, the use of copper components, excellent sealing performance, no leakage of the glue, powEPTleakage, do not pollute the surroundings, but also has simple maintenance and EPT service lifestyle.
Parameter:
Model | X(S)N- 3×32 |
X(S)N- 5×32 |
X(S)N- 10×32 |
X(S)N- 20×32 |
X(S)N- 25×32 |
X(S)N- 35×30 |
X(S)N- 55×30 |
X(S)N- 75×30 |
X(S)N- 110×30 |
X(S)N- 150×30 |
X(S)N- 200×30 |
Whole Volume Of MiXiHu (West Lake) Dis.ng Chamber(L) |
eight | 15 | twenty five | forty five | 55 | seventy five | a hundred twenty five | a hundred and seventy | 250 | 325 | 440 |
Working Volume Of MiXiHu (West Lake) Dis.ng Chamer(L) |
3 | 5 | ten | 20 | 25 | 35 | 55 | seventy five | 110 | a hundred and fifty | 200 |
Driving EPT EPT(KW) |
5.5 | 11 | 22 | 37 | 37 | 55 | seventy five | one hundred ten | 185 | 220 | 280 |
Tilting EPT EPT(KW) | .fifty five | 1.1 | 1.1 | one.five | 1.5 | two.2 | two.2 | 4 | five.5 | 11 | eleven |
Tilting Angle( deg) | one hundred forty | 140 | one hundred forty | a hundred and forty | 140 | 140 | one hundred forty | 140 | one hundred forty | 135 | one hundred thirty five |
Rotating Pace of Rotor(Front/Rear) (r/min) |
32/24.five | 32/23.five | 32/25 | 32/27 | 32/24.five | 30/24.five | 32/24.5 | 32/24.5 | 32/24.five | 30/24.five | thirty/24.5 |
Force of Cooling Water(MPA) | .two-.four | .two-.4 | .two-.4 | .2-.4 | .2-.4 | .three-.four | .3-.4 | .3-.four | .3-.4 | .three-.4 | .3-.4 |
All round Dimension (LxWxH)(mm) | 2000x 1000x 2220 |
1850x 1200x 2280 |
2450x 1650x 2350 |
2675x 1650x 2560 |
2675x 1650x 2560 |
3200x 1900x 2950 |
3230x 1927x 2958 |
3325x 2615x 3105 |
4075x 2712x 3580 |
4250x 2750x 4106 |
4250x 3400x 4215 |
Gross Bodyweight(T) | ~two | ~2.1 | ~2.1 | ~four | ~four.five | ~six.3 | ~7.1 | ~9.five | ~fourteen.nine | ~19.five | ~22.five |
EPT:
EPT painting finished ahead of shipping and delivery, and then wrapped with extend movie, steer clear of rubbing the paint off the surface, plywood EPT can be tailored, key areas, this sort of as digital control box, will be wrapped by EPTproof EPT resources, and then packed in plywood case or container.
FAQ:
1. What does your factory do reXiHu (West Lake) Dis.Hu (West Lake) Dis.ding good quality management?
We spend much a lot more EPTance to top quality manage from the very beginning to the conclude of manufacturing. Every EPT will be completely assembled and carefully examined before shipment.
two. What is the EPT good quality promise?
EPT assure time is one calendar year.We select world well-known manufacturer factors to hold our EPT in ideal working situation.
3. Are you able to give set up and commissioning overEPT?How EPT time will it take?
Of course, we can offer overEPT provider and technical support but customer needs to pay out for the EPT of the installation. Little EPT normally normally takes inside of two~3 times. Large generation line typically requires about 30 days.
4. How can I EPT you to supply the rigEPT EPT as I requested?
We will definitely deliver a great top quality EPT as we mentioned and confirmed in the buy. The main of our company culture is innovation,quality,integrity and effectiveness. Also we have had a lot of good cooperation with planet popular rubber creation producers.
If you arrive to our manufacturing facility, we can display the person around us.
five. How can we go to your aspect?
We are found in EPTngdao Metropolis, ZheJiang province, EPT. The title of airport is EPTngdao liuting airport. We will select up you at the airport.
Our Solutions:
#9830 Our engineers can style goal EPTs for consumers and deliver them the drawing to confirm. We are alwaEPTon the facet of conserving your EPT.
#9830 In the method of creation, we will consider photographs and send out to consumers for their observe the development.
#9830 Documents this kind of as EPT listing, professional bill, and invoice of lading and so forth. will be despatched following the shipping and delivery.
#9830 We could supply cost-free EPT basis DWG, installation drawing, user XiHu (West Lake) Dis.Hu (West Lake) Dis., upkeep guide and portion drawing.
#9830 We offer overEPT engineer service and support to prepare your staff to function the EPT.
Welcome your inquiry!