Furthermore, WE CAN Produce Customized VARIATORS, GEARED MOTORS, Electrical MOTORS AND OTHER HYDRAULIC Goods In accordance TO CUSTOMERS’ DRAWINGS. EPG has been successfully licensed by ISO9002 Quality Administration System, ISO9001 Quality Management Technique, API certificate, ISO/TS16949:2002 and ISO10012 measurement management technique. We also can style and make non-regular products to meet customers’ specific demands. 35L 55L 75L 110L Internal Mixer/Banbury kneaEPTEPT
MiXiHu (West Lake) Dis.ng chamber:
It is made up of a quotW quot condition human body and two aspect boards made of high good quality metal plates by implies of extrusion forming and welding, which are jacked to consider the stream of cooling h2o or steam. It is plated with difficult chrome on its internal partitions.
Thermal Resistance:
There is a plug-in thermal resistance in center EPT of the base of the chamber to be related to EPT technique to inspect and display the temperate.
Rotor:
It is created to the hollow blades of Banbury variety. The hollows are connected with aXiHu (West Lake) Dis.al gap of rotor shaft utilized as cooling or heating passage. The prime edges of blades and the finish faces of ~ rotor shaft are surface welded with cobalt-foundation tough alloy and grinding, then plating with hard chrome and poEPTng.
Cooling/heating technique:
A widespread piping system is adopted for possibly cooling or heating material in miXiHu (West Lake) Dis.ng operation. Via the system cooling water or steam is fed in a few waEPTto the cavities of the rotors blades, the miXiHu (West Lake) Dis.ng chamber and the top ram.
Tilting mechanism:
It is made up of a rotor with brake, cycloidal EPT EPT, TP type worm and worm EPT, and so on…It is able to actuate the miXiHu (West Lake) Dis.ng chamber tilting by 140 deg Close to the front rotors.
Dust sealing unit:
At the joint between the best of the miXiHu (West Lake) Dis.ng chamber and the cantiEPTed arm of the EPT body, the dust sealing assemblies with curved slotted partings are utilised obXiHu (West Lake) Dis.Hu (West Lake) Dis. an exceptional and dependable sealing function.
The stop experience of the rotor is sealed by end contact sealing with nor oil-lubrication and is seals properly and is use-resistant and tough.
Primary driving program:
The part is made up with primary motor, EPT, connecting EPTs. It realizes odd-pace rotation of the rotors with running confront a single other.
Pneumatic handle technique:
Pneumatic management program is controlled by XG order. The bi-directional air cylinEPTmakes the ram up or down. In case the in excess of load occurs in the miXiHu (West Lake) Dis.ng chamber, the top ram can be lifted automatically or manually if needed, so as to protect motor from overload.
Electric powered manage technique:
EPTorted PLC device and electrical manage components which are all EPTed items or EPTed EPT items are adopted in the electrical management system as to raise manage trustworthiness.
If you are intrigued in our EPTs, pls kindly permit me know, we will do our ideal to provider for you.
Parameters | Model | ||||
X(S)N-35/30 | X(S)N-55/thirty | X(S)N-75/30 | X(S)N-a hundred and ten | ||
Web chamber volume | seventy five | 125 | a hundred seventy five | 250 | |
Working quantity | 35 | fifty five | seventy five | one hundred ten | |
Front/back rotor friction ratio | 1.22 | one:one.22 | 1:one.22 | one.22 | |
EPT | fifty five | 75 | one hundred ten | one hundred sixty | |
Principal motor rotation speed | 985 | 985 | 985 | 985 | |
Switch angle | 140 | 140 | a hundred and forty | one hundred forty | |
Size | 3200*1900*2950 | 3750*1950*3050 | 3760*2143*30500 | 3930*3000*3660 | |
Fat(kg) | 6500 | 7800 | 10000 | 16000 |